Getting a Leeds terrace ready for its EICR visit

In a lot of Leeds terraces the meter and consumer unit are at the bottom of the cellar steps. A few small jobs make the visit quicker.

Landlord guides2 min read

In a lot of Leeds terraces the meter and consumer unit are at the bottom of the cellar steps. A little preparation makes the visit quicker for everyone.

Before we arrive

  • Clear the cellar steps and the board. Boxes, bikes and paint tins usually end up stacked against the consumer unit.
  • Tell the tenants the power goes off. Short spells only, but fridges, Wi-Fi and gaming PCs will notice.
  • Keys for every room. Locked bedrooms, the attic room, outhouses in the yard, garages and meter cupboards.
  • Find the last report. An old EICR or an installation certificate from a rewire helps the inspector compare results.
  • Flag anything that can’t go off. Medical equipment, alarm panels, fish tanks or a home server. We’ll plan around them.
  • Mention parking. Resident permit zones around Headingley, Hyde Park and the city centre are easier with a heads-up.
  • Note any extensions or outbuildings. Kitchen extensions, cellar conversions and garden-room supplies all get tested.

On the day

A visual check comes first, then dead tests with the power off for short spells, then live tests, including RCD trip times. We tell the tenants before anything goes off, and the PDF report reaches you within 48 hours of the visit.

Want a fixed price for your property? Call 020 3386 1854 or send us the details and we’ll reply with the price in writing.

Want a fixed price for your Leeds rental? One call gets you the price in writing.

Keep reading

An old rewireable fuse board with one carrier pulled out

Are old rewireable fuses an automatic EICR fail?

Plenty of Leeds terraces still have an old fuse box in the cellar. On its own that doesn't fail the report. Here is what the...

Read more about Are old rewireable fuses an automatic EICR fail?
Cellar steps with a checklist and a hanging light bulb

Getting a Leeds terrace ready for its EICR visit

In a lot of Leeds terraces the meter and consumer unit are at the bottom of the cellar steps. A few small jobs make the...

Read more about Getting a Leeds terrace ready for its EICR visit
Tile map of Leeds wards with the selective licensing wards in brick red

Leeds selective licensing 2026: what it means for your EICR

A new selective licensing scheme covers parts of six Leeds wards from 9 February 2026. Here is how it sits alongside the national EICR rules.

Read more about Leeds selective licensing 2026: what it means for your EICR